About SENNISI · Since 1999

Where industry needs fire, SENNISI is already there.

Since 1999, SENNISI has designed, built and fired combustion systems for the toughest heat in industry, from Shenzhen to plants across China and Southeast Asia, now expanding into the Middle East.

Behind every sheet of glass, every galvanized beam, every heat-treated gear, every painted car body and every cleaned exhaust stack, there is a flame that has to be exactly right. SENNISI builds that flame.

1999

A Sino-US joint venture

Sennisi Machinery Equipment Factory is founded in Shenzhen as a Sino-US joint venture, building industrial burners and combustion equipment.

2008

Combustion engineering

Reorganized as Shenzhen Sennisi Technology Co., Ltd.: complete combustion systems, electric heating and thermal projects, from design to commissioning.

Today

Asia, and next the Middle East

Burners, gas trains and control panels running in plants across China and Southeast Asia, now expanding into the Middle East, with engineering support by video or on site.

Where our flames burn

The toughest heat in industry.

On record

Shipped, certified, on the show floor.

SENNISI at the 17th Asia Heat Expo 2021, booth C344, Canton Fair Complex, Guangzhou
Asia Heat Expo 202117th edition, Canton Fair Complex, Guangzhou. SENNISI booth C344.
ASEAN-China FTA Form E certificate of origin for a combustion furnace made by SENNISI, shipped to Bangkok
Certificate of origin, ThailandASEAN-China FTA Form E: a combustion furnace manufactured by SENNISI, shipped Shekou to Bangkok. Customer details hidden.
China customs export declaration for 13 gas burners shipped to Malaysia
Export declaration, MalaysiaChina customs export record: 13 gas burners for heating, natural gas, shipped to Malaysia. Customer details hidden.
Why SENNISI

Three things we never compromise.

Proven before it ships

Every burner is built, wired and test-fired with its gas train and control panel in our Shenzhen works before it is crated. We don't ship promises. We ship heat that has already been proven.

Fitted to your furnace

When original burners grow old and parts grow scarce, we engineer the replacement to the same rating, fuel and mounting, around your furnace, so the line keeps running.

An engineer answers

Every enquiry is answered by an engineer who understands heat load, gas pressure and the plant floor. One partner for design, sizing, supply, commissioning, service and spare parts.

SENNISI packaged burners tested and ready for delivery in the Shenzhen workshop
Burners tested and ready for delivery, Shenzhen.

Send us your nameplate.

A nameplate photo, or your heat load, fuel and gas pressure. The reply comes from an engineer.

WhatsApp an engineer →   [email protected]