Pit furnace with ceramic fibre lining and burner ports in the end wall
Projects

Pit furnace: shell, lining and gas trains

A large pit furnace followed from the empty steel shell to the finished ceramic fibre lining, with the burner ports set in the walls and gas trains piped along the side.

Build sequence

  1. Steel shell set in the pit and the first insulation laid on the floor.
  2. Ceramic fibre modules fixed to the walls, leaving openings for the burners.
  3. Gas trains and combustion air piping run along the furnace side to each burner position.

Burner choice for this kind of furnace

Deep furnaces with a dense load need strong circulation to avoid cold spots at the bottom, which is where high-velocity burners are used. More on kilns and heat-treatment furnaces.