Four framed burner skids with control panels and gas trains in the workshop
Projects

Framed burner skids for a steel plant

Burner, blower, gas train and control panel built into one lifting frame, so the whole unit can be craned into place and connected to gas and power.

Why a framed skid

In a steel plant the heater is often moved between positions or lifted onto equipment. A frame with lifting eyes protects the gas train and panel and lets the unit be set down, connected and fired without rebuilding anything on site.

More on gas trains and control panels.

Send us your nameplate.

A nameplate photo, or your heat load, fuel and gas pressure. The reply comes from an engineer.

WhatsApp an engineer →   [email protected]